MEP – BUILDING SERVICES PROJECTS

CONSTRUCTION OF MULTI-MODAL FACILITY, GE CALABAR – EMERALDClient: General Electric / Julius Berger FZE Location: Calabar (CFTZ), Nigeria Project status: On going Project characteristics: Turn Key Project – MEP, design, engineering services, testing and commissioning. Units: Multi – modal manufacturing facility, training & administration facility, energy center, gas storage, water reservoir, waste storage, etc.NATIONAL INSTITUTE…

WATER TREATMENT PROJECTS

NATIONAL WATER REHABILITATION PROJECTClient: Plateau State Water Board Location: Plateau State – Jos, Laminga, Yakubu Gowon, Bukuru Project status: Completed 1997 Project characteristics: National Rehabilitation Project of Plateau State – Supply and installation of water pumps, 450kVA generator, hydrochloride system and chlorination unit, overhaul and repair of two 530kVA Darman generators. Rehabilitation of some water…

TELECOMMUNICATION AND GSM PROJECTS

EXTENSION OF SCADA SIGNALS AT KATAMPE SUBSTATIONClient: Nigerian Electricity Power Authority (NEPA) Location: Abuja, Nigeria Project status: Completed 2007 Project characteristics: Turn key project – Extension of SCADA signals from the switchyard to the control rooms at Katampe 132/33kV substation.GSM REPETITOR STATIONSClient: GLOBALCOM / SIEMENS Location: Kaduna, Jos, Bauchi, Nigeria Project status: Completed 2005 Project…

POWER PROJECTS – POWER TRANSMISSION AND DISTRIBUTION

CONSTRUCTION OF 132kV SC TRANSMISSION LINE AND 132/33/3.3kV SUBSTATION at “Tarkwa” Island – Lagos for Atlas Cove Oil DepotClient: Nigerian National Petroleum Corporation (NNPC) Location: “Tarkwa” Island – Lagos Project status: Completed 2016 Project characteristics: Turn key EPC project –Design, supply, construction & commissioning of 132kV SC Transmission Line 20km long and 1x15MVA & 2×7.5MVA,…

POWER PROJECTS – SUBSTATION PROJECTS

Installing equipment on gas power plant AZURA EDO 330kV, BeninClient: Siemens Nigeria Ltd. Location: Benin, Nigeria Project status: Completed 2017 Project characteristics: Installing equipment on a new gas power plant Azura, also on existing substation Benin North and installation of 3 linking 330kV towers. Equipment is Siemens AG.CONSTRUCTION OF SUBSTATION UGWUAJI (EXTENSION) 330/132/33kV, 1x150MVA &…