CONSTRUCTION OF 132kV SC TRANSMISSION LINE AND 132/33/3.3kV SUBSTATION at “Tarkwa” Island – Lagos for Atlas Cove Oil Depot

Client: Nigerian National Petroleum Corporation (NNPC)

Location: “Tarkwa” Island – Lagos

Project status: Completed 2016

Project characteristics:

Turn key EPC project –Design, supply, construction & commissioning of 132kV SC Transmission Line 20km long and 1x15MVA & 2×7.5MVA, 132/33/3.3kV Substation.

TRANSMISSION LINE ERUKAN – OMOTOSHO

Client: Transmission Company of Nigeria (TCN)

Location: Erukan – Omotosho, Nigeria

Project status: On going

Project characteristics:

Turn key project – Design, supply, construction & commissioning of 330kV DC Over Head
Transmission Line – 160km.

TRANSMISSION LINE UGWUAJI – IKOT EKPENE

Client: Niger Delta Power Holding Company (NDPHC) / NIPP

Location: Enugu and Akwa Ibom States, Nigeria

Project status: Completed 2015

Project characteristics:

Turn key EPC project – Design, supply, construction and commissioning of two DC 330kV Transmission Lines, 2x162km + 7km long, conductor type – twin bundle ACSR “BISON”, steel latice towers, from Ugwuaji to Ikot Ekpene and Ugwuaji to New Haven (7km).
Construction of 330kV SG in New Haven.

REHABILITATION AND EXPANSION OF ABUJA AIRPORT EXPRESSWAY - DUALIZATION OF STREET LIGHTING

Client: Bilfinger Berger AG Nigeria Division & Julius Berger Nigeria PLC / Federal Capital Development Authority (FCDA)

Location: Abuja, Nigeria

Project status: Completed 2013

Project characteristics:

Electrical Works, Procurement, Installation, Testing and Commissioning.
LOCATION: Airport Expressway Abuja – Gwagvalada.
SYSTEMS: Street Lighting System and associated accessories (excluding poles), 10 No. Transformers 500kVA, 33kV/0.415kV compact substations, underground cables and street lighting along 44km airport highway Abuja.

LEKKI - IKOYI BRIDGE, LAGOS

Client: Bilfinger Berger AG Nigeria Division & Julius Berger Nigeria PLC

Location: Lagos, Nigeria

Project status: Completed 2013

Project characteristics:

Electrical Works, Procurement and Delivery (CPT Bremen), Installation, Testing and Commissioning.
Electrical Systems: Street Lighting, Toll Station, Pylon – Obstruction Lighting and Decorative Illumination.

TRANSMISSION LINE JOS – KAFANCHAN

Client: Power Holding Company of Nigeria (PHCN)

Location: Plateau and Kaduna States, Nigeria

Project status: Completed 2012

Project characteristics:

Turn key EPC project – Engineering, procurement and construction of 132kV DC Transmission Line, 80km long.
Conductor type – twin bundle ACSR “BEAR”, steel latice towers, average span 200m.

REHABILITATION OF 132kV DC TRANSMISSION LINE KADUNA - ZARIA

Client: Power Holding Company of Nigerian (PHCN)

Location: Kaduna – Zaria, Nigeria

Project status: Completed 2011

Project characteristics:

Rehabilitation of 80 km 132kV Transmission Line. First instalment of T-ACSR conductor in Nigeria.

TRANSMISSION LINE 132kV DC, AFAM – PORT HARCOURT

Client: Taleveras Group / Saipem / Rivers State Government

Location: Afam – Eleme (Port Harcourt), Nigeria

Project status: Completed 2011

Project characteristics:

Turn key project – Design, supply, construction & commissioning of 26km 132kV DC Over Head Transmission Line.

PORT HARCOURT ELME JUNCTION – STREET LIGHTING

Client: Bilfinger Berger AG Nigeria Division & Julius Berger Nigeria PLC

Location: Lagos, Nigeria

Project status: Completed 2011

Project characteristics:

Electrical works, procurement and delivery (FOB Bremen), installation, testing and commissioning.
SYSTEM: Street Lighting System and associated accessories (109 poles) including Transformer 500kVA.

TRANSMISSION LINE EGBIN – BENIN / EGBIN IKEJA WEST & SUBSTATION EGBIN EXTENTION

Client: Power Holding Company of Nigeria (PHCN)

Location: Lagos State, Nigeria

Project status: Completed 2009

Project characteristics:

Design, procurement, construction & commissioning of 330kV DC transmission line 28km long, conductor type – twin bundle ACSR “BISON”, steel lattice towers, average span 400m.
Design, procurement, construction & commissioning of 2 additional line bays in 330/132kV substation at Egbin.

DISTRIBUTION LINE 33kV DC, APO SUBSTATION – ABUJA INTERNATIONAL AIRPORT

Client: NDPHC / Federal Ministry of Power and Steel

Location: Abuja, Nigeria

Project status: Completed 2008

Project characteristics:

Turn key project – Construction of 33kV DC distribution line, 44km from Apo Substation to Abuja International Airport.

TRANSMISSION LINE SHIRORO – ABUJA

Client: Nigerian Electricity Power Authority (NEPA) / ABB

Location: Abuja State, Nigeria

Project status: Completed 2005

Project characteristics:

Construction of 330kV DC Transmission Line, 150km long, conductor type – twin bundle ACSR “BISON”, steel lattice towers, average span 400m.

TRANSMISSION LINE ALIADE –MAKURDI

Client: Nigerian Electricity Power Authority (NEPA)

Location: Benue State, Nigeria

Project status: Completed 2001

Project characteristics:

330kV SC Transmission Line, 46km long, conductors type ACSR “Bison” 350 mm2 two per phase, earth–wire conductor GSW 2x140mm2. Steel lattice self supported structure. Average span 400m.

DISTRIBUTION LINE AJA – LEKKI

Client: NEPA

Location: Lagos

Project status: Completed 2000

Project characteristics:

Energo executed on the Turn key basis procurement and construction of the distribution line with the following characteristics:

33kV DC Distribution Line, 20km long, conductor type – ACSR “Bear”, steel lattice towers and steel poles.

LDSE - LAGOS DISTRIBUTION SYSTEM

Client: Nigerian Electricity Power Authority (NEPA)

Location: Lagos State, Nigeria

Project status: Completed 1992

Project characteristics:

The project LDSE represents one of the most sophisticated expansion project of the network at different voltage levels. As such it takes an outstanding place among the ones executed by Energo Nigeria in the past.
99km 132kV DC Transmission Line and 50km 33kV DC Distribution Line. 488 steel lattice towers for 132kV and 516 tubular steel poles for 132kV and 33kV. Phase conductors – ACSR “Bear”, protection cable steel 58mm2, glass cap insulators and long porcelain insulators with safety clamps.

NEPA POWER SUPPLY TO CLN HOSPITAL AND RECREATION CENTER

Client: CHEVRON NIGERIA Ltd

Location: Oworonoshoki / Gbagada, Lagos Nigeria

Project status: Completed 1999

Project characteristics:

Project consisted of laying of 33kV underground cable network (cable type 3x150mm2 XLPE/SWA/PVC) between NEPA’s 132/33kV substation at Oworonshoki and 33/11kV, 2MVA substation at CLN at Agbada as well as all civil, electrical and mechanical works on the SS.