Installing equipment on gas power plant AZURA EDO 330kV, Benin
Location: Benin, Nigeria
Project status: Completed 2017
Project characteristics:
Installing equipment on a new gas power plant Azura, also on existing substation Benin North and installation of 3 linking 330kV towers. Equipment is Siemens AG.
CONSTRUCTION OF SUBSTATION UGWUAJI (EXTENSION) 330/132/33kV, 1x150MVA & 1x60MVA
Location: Ugwuaji, Nigeria
Project status: Completed 2015
Project characteristics:Turn key EPC project – Design, supply, construction & commissioning of 1x150MVA, 330/132kV and 1x60MVA, 132/33kV substation.
SUBSTATION UGWUAJI 330kV (SWITCHYARD)
Location: Ugwuaji, Nigeria
Project status: Completed 2014
Project characteristics:
Turn key EPC project – Design, supply, construction & commissioning of 330kV Substation (Switchyard) Ugwuaji.
REPLACEMENT OF DISTANCE PROTECTION RELAYS
Location: Nigeria
Project status: Completed 2005
Project characteristics:
Replacement of distance protection relays in 11 Grid power plants and substations in various country areas.
SUBSTATION OKE ARO (ERUKAN)
Location: Lagos, Lagos state, Nigeria
Project status: Completed 2013
Project characteristics:
Turn key EPC project – Design, procurement, construction & commissioning of substation.
2x300MVA 330/132kV, 1 1/5 CBS per bay, 3 OHL diameter, 1 trafo-diameter, 2x300MVA autotransformers, 330/132/33kV and 1x75MVA, 330kV shunt reactor.
2x60MVA 132/33kV, 1 1/5 CBS per bay, 5 OHL diameter, 2 trafo-diameter, 2x60MVA power transformer 132/33kV and 6x33kV OHL Bays.
330kV SUBSTATION AT GAS TURBINE POWER PLANT – GEREGU II Geregu, Lokoja, Kogi State, Nigeria
Location: Lokoja, Kogi State, Nigeria
Project status: Completed 2013
Project characteristics:
Erection, Installation & Commissioning of 330kV Substation at Gas Turbine Power Plant.
SUBSTATION „KATAMPE“
Location: Abuja, Nigeria
Project status: Completed 2003
Project characteristics:
Design, procurement, construction & commissioning of 2x150MVA, 330/132kV and 2x60MVA, 132/33kV SG with double bus-bars and 1 1/2 CBS. Connection to new 330kV and existing 132kV transmission line. Construction of residential houses for operational and maintenance staff.
SUBSTATION „CENTRAL AREA“ (GIS)
Location: Abuja, Nigeria
Project status: Completed 2004
Project characteristics:
Design, procurement, construction & commissioning of GIS substation, 2x60MVA, 132/33kV SG with double bus-bars and 1 1/2 CBS. Construction of residential houses for operational and maintenance staff.
SUBSTATION UYO
Location: Akwa Ibom State, Nigeria
Project status: Completed 1997
Project characteristics:
As the main contractor, Energo has successfully completed project of the Sub Station Uyo on the Turn Key basis.
Design, procurement, construction and commissioning of 2x40MVA, 132/33kV SG with connection to the existing 132kV SC Transmission Line. Construction of three residential houses for the Client’s operation and maintenance staff.
SUBSTATION ILESHA
Location: Ilesha – Osun State, Nigeria
Project status: Completed 1998
Project characteristics:
Energo executed Turn Key project as the subcontractor of ABB for the following works: Design, procurement, construction and commissioning of the Ilesha Substation.
Standard NEPA Substation, 2x40MVA, 132/33kV with connection to the existing 132 kV SC Transmission line. Construction of residential houses for operational and maintenance staff.